Have a PLC that needs to talk to something else?
Show us the PLC and the system you're trying to connect it to—ERP, MES, database, dashboard, another machine, or something else. We'll help you understand what the connection could look like.
Your PLC may already know where the operation is winning—or losing.
Work in Process (WIP)See where work is, how long it has been there, what is waiting and where queues are building between operations.
Equipment UtilizationUnderstand run time, idle time, cycles, changeovers and whether equipment is being used the way the operation expects.
Materials, Chemicals & RecipesCapture actual consumption, batch or recipe information and process inputs so operations can compare what was planned with what was actually used.
Degraded OperationsSurface cycle-time drift, recurring faults, abnormal conditions or reduced performance before they simply become accepted as “normal.”
Maintenance SignalsUse operating data, alarms, counts and equipment conditions to help identify when maintenance may be required and give the team better context for what happened.
Winning is in the WIP.
Finished goods tell you what already happened. WIP shows what is happening now. When PLC data becomes visible beyond the machine, leaders can see where work is waiting, where capacity is being consumed, where materials are going and where the process is beginning to degrade—while there is still time to act.
Start with what you're seeing.
You don't need a specification, a scoped project, or the technical answer. If production information is stuck in a machine, being retyped into a spreadsheet, or not reaching the system that needs it, that's enough to start.
Dashboard · System
PLC → ERP
Move production counts, status, downtime or other machine data into the business system that needs it.
PLC → Database
Capture machine data automatically instead of relying on handwritten or manually re-entered information.
PLC → Dashboard
Make production information visible to the people making decisions without replacing working equipment.
Legacy PLC → Modern System
Explore what can stay in place and what is needed to connect older equipment to newer systems.
Machine → MES / SCADA
Connect equipment information to the operational systems managing production.
Machine → Machine
Explore a reliable way for equipment or production steps to exchange the information they need.
What we'll look at
The first conversation is meant to answer a practical question: what would it take to make these systems talk?
Tell us what you're trying to connect.
Give us only what you know. Technical details and photos are helpful, but you don't need all the answers.
What happens next?
A real person reviews what you sent.
Ayoka looks at the problem, the equipment and the system you're trying to connect before the conversation.
We spend about 30 minutes on the connection.
We'll ask only the questions needed to understand what is happening now and what you want to happen instead.
You leave with a PLC Connection Snapshot.
A simple summary of the current state, a possible connection path, what may be able to stay, what may be needed and the next practical step.
Your PLC Connection Snapshot
This is the tangible takeaway. Even if you don't move forward with Ayoka, the conversation should leave you with a clearer picture of the problem.
How This Applies to Your Operation
How can we tell whether our machines can provide useful production data?
Can older machines help us understand downtime and WIP?
How is a PLC Connection Check different from a full automation project?
Related solution: If your operation needs software around these connections, explore Rent Custom Software.
You don't need the solution. Start with the problem.
Tell us what the PLC or machine needs to talk to and what's getting in the way.
Check My PLC Connection